Started Machining V2

Got V2 back from radiology and it looks great. The changes I made to the gating and risers solved the bad shrink porosity I had in the front.

Got it all set up in the mill.

IMG_1194

If it aint crashing it’s clearance.

IMG_1195

 

Got the bottom side completely finished.

Surfaced, head bolt holes and dowels, water passages.

IMG_1196

 

Chamber roughing pass.

IMG_1197

 

IMG_1198

Finish pass completed.

 

IMG_1201

The chamber size is 45cc’s. This should yield a 10.8:1 CR on the build without changing the pistons.

 

2 thoughts on “Started Machining V2

Leave a Reply

Your email address will not be published. Required fields are marked *