Had a problem with my 3D model for the lobes. I didn’t catch it until it messed up 2 lobes. It was right on the edge of not needing a weld but I figured better safe than sorry.
They are boxed up and heading to Isky today. 6 days to get there, 6 to 8 weeks to grind, 6 days back. Now I know how my customers feel:)
I’ve got plenty to do. The manifolds are on the way to me so I can get that all squared away. Then the valve cover.